Knightsbridge Palace Hotel
- Location:
- London
- Status:
- Ongoing
- Client:
- Prime Developments Ltd
- Type of Work:
- Monitoring
Description
The new hotel development will encompass ten storeys with the top three being private homes. With demolition now complete and the site cleared, piling has started with a contiguous pile system around the perimeter. Once installed the impressive 6 floor deep basement dig will commence, SES will be on site to monitor any deformation within the contiguous pile wall using inclinometers in conjunction with reflective targets. As well as monitoring the basement construction, SES is monitoring the surrounding buildings for heave and settlement using the method of precise levelling.
Ravenscraig Sports Facility
- Location:
- Motherwell
- Status:
- Complete
- Duration:
- 6 Months
- Client:
- Bone Steel
- Type of Work:
- Setting Out
Description
The area of Ravenscraig in Scotland's Central Belt will become home to over 10,000 people, and is expected to create 12,000 jobs and attract in excess of £1.2 billion of private sector investment over the next 15 to 20 years. SES is involved with the setting out of the approx 2500 ton steel Sports Facility. The building boasts an indoor football pitch, sports hall, dance studios and much more. We currently line and level the steelwork fabricated by Bonesteel and produce as-built surveys for the hand-over to Balfour Beatty.