Royal Shakespeare Theatre

Location:
Stratford-Apon-Avon
Status:
Ongoing
Client:
Mace Group Ltd
Type of Work:
Monitoring and Construction Surveying
Case Study
Case Study2 Case Study3 Case Study4

Description

SES is proud to be the contractor managing the dimensional control on the Royal Shakespeare Company's Theatre as it transforms into a state of the art facility. The Grade II listed building will undergo radical changes in the form of a new 1,000 seat auditorium, a new tower which will enable visitors to view the town and many more.

As construction surveyors, SES had to monitor the retained art deco facade whilst the new beams and floors were being installed, this was done by using 19 tiltmeters and reflective targets. The tiltmeters transmitted data wirelessly to a centralised data logger which in turn sent the data to SES HQ via sim card. This data was then processed and up-loaded onto a specific website for the client, designers and project team to view and download.

 

Gloucester Quays

Location:
Gloucester
Status:
Complete
Client:
Bovis Lend Lease
Case Study
Case Study8

Description

The £200 million Gloucester Quays development is predominantly retail space at 58,216.80m², however, it will be surrounded by 7,753m² leisure space, 22,860m² office space and 1,500 car parking spaces. Bovis brought SES on board to oversee the Primary Survey Control and relative setting out. With over 100 Factory Outlet tenancies, four anchor tenants it meant our surveyors were busy facilitating the Project Team.

Main works include:

  • Establishment of the Primary Survey Control
  • Transfer grid lines to enable co-ordinated interfaces between different trades
  • As-built surveys floor nett/gross area calculations (as proof for handover to clients)